Cover story No. 4 (2023): Real estate: economics, management

Improving the organizational scheme for conducting state examination of design documentation in order to obtain a reliable estimated cost using BIM

pdf
How to Cite

Improving the organizational scheme for conducting state examination of design documentation in order to obtain a reliable estimated cost using BIM

Authors

  • Natalia Yurievna Seregina Autonomous Institution of the Sverdlovsk region "Department of State Expertise"
  • Sergey Andreevich Serbin Autonomous Institution of the Sverdlovsk region "Department of State Expertise"
  • Nikita Igorevich Fomin Ural Federal University named after the First President of Russia B. N. Yeltsin (UrFU)

DOI:

https://doi.org/10.22337/2073-8412-2023-4-13-20

Keywords:

building information modelling (BIM) technologies, building information model, state examination, design documentation, reliable estimated cost, life cycle of capital construction objects

Abstract

The organizational possibilities of resolving the problem of discrepancy between the estimated and actual costs of capital construction assets by dividing the process of state expertise into two organizational phases: checking the design solution of a capital construction project and assessing the reliability of the estimated cost were explored. The authors conducted an expert analysis of the current number of capital construction projects based on a survey of an expert group. The assessment revealed that on average 59.5 % of capital construction assets per year, financed from the state and municipal budgets, have more than 2 % discrepancy between the estimated cost at the stage of architectural and construction design and the actual cost of construction. The labour costs of specialists from the Ministry of Construction and Infrastructure Development of the Sverdlovsk Region were assessed if it was necessary to adjust budget programmes. The current scheme of interaction between participants in the construction process was formed, on the basis of which problem phases were identified. In problem phases, there is an information gap between the detail of the building information model necessary for the examination of design solutions and for assessing the reliability of the estimated cost of a capital construction asset. The authors of the paper have developed and proposed an interaction scheme using building information modelling technologies to obtain the estimated cost of capital construction assets eliminating the information gap by dividing the state examination process into two phases and calculated the difference in the time costs of processes in both schemes that is 51 days. It was proposed to make adjustments to the legislation with the approval of the examination process in two phases, as well as the approval of unified requirements for building information models for the implementation of the proposed scheme and the introduction of building information modelling technologies into the state examination process.

274 82

Author Biographies

  • Natalia Yurievna Seregina, Autonomous Institution of the Sverdlovsk region "Department of State Expertise"

    Head, State Autonomous Institution of the Sverdlovsk region

  • Sergey Andreevich Serbin, Autonomous Institution of the Sverdlovsk region "Department of State Expertise"

    main specialist

  • Nikita Igorevich Fomin, Ural Federal University named after the First President of Russia B. N. Yeltsin (UrFU)

    Сandidate of Technical Sciences, Docent, Director of the Institute of Construction and Architecture

References

Kassem M., Succar B., Dawood N. A proposed approach to comparing the BIM maturity of countries // 30th International Conference on the Applications of IT in the AEC IndustryAt: Beijing. China. Beijing, 2013. Pр. 13–24. DOI: 10.13140/2.1.2308.5766

NBS. National BIM Report. 2017. Pр. 48–59.

Smart Market Report. The business value of BIM for infrastructure: Addressing America's infrastructure challenges with collaboration and technology. McGraw Hill Constaction, 2012. 30 p. URL: https://images.autodesk.com/adsk/files/business_value_of_bim_for_infrastructure_smartmarket_report__2012.pdf

Smart Market Report. The business value of BIM for construction in major global markets: How contractors around the world are driving innovation with building information modeling. McGraw Hill Constaction, 2014. Pр. 2–47. URL: https://icn.nl/pdf/bim_construction.pdf

Ожигин Д. Анализ текущей ситуации на российском BIM-рынке в области гражданского строительства // RUБЕЖ. 3 января 2021, 16:51. URL: https://ru-bezh.ru/denis-ozhigin/39134-analiz-tekushhej-situaczii-narossijskom-bim-ryinke-v-oblasti-gr

Градостроительный кодекс Российской Федерации : от 29.12.2004 № 190-ФЗ (ред. от 01.05.2022).

О внесении изменений в Постановление Правительства Российской Федерации от 5 марта 2021 г. № 331 : Постанов­ление Правительства Российской Федерации № 2357 от 20.12.2022.

Об утверждении Правил формирования и ведения информационной модели объекта капитального строитель­ства, состава сведений, документов и материалов, включа­емых в информационную модель объекта капитального строительства и представляемых в форме электронных документов, и требований к форматам указанных электронных документов, а также о внесении изменения в пункт 6 Положения о выполнении инженерных изысканий для подготовки проектной документации, строительства, рекон­струкции объектов капитального строительства : Постанов­ление Правительства Российской Федерации от 15.09.2020 № 1431.

Siebelink S., Voordijk H., Endedijk M., Adriaanse A. Understanding barriers to BIM implementation: Their impact across organizational levels in relation to BIM maturity. Frontiers of Engineering Management. 2021. Vol. 8 (9). Pp. 236–257. DOI: 10.1007/s42524-019-0088-2 DOI: https://doi.org/10.1007/s42524-019-0088-2

СП 333.1325800.2020. Информационное моделирование в строительстве. Правила формирования информационной модели объектов на различных стадиях жизненного цикла.

BIM & design стандарт // Development Systems. 20111. URL: https://standard.ds.do/bim (дата обращения: 05.07.2023).

Об утверждении Требований к подготовке проектной документации, содержащей материалы в форме информа­ционной модели площадных объектов, финансирование строительства которых осуществляется с привлечением средств областного бюджета : Приказ Министерства строительства и развития инфраструктуры Свердловской области от 17.02.2023 № 121-17.

О составе разделов проектной документации и требованиях к их содержанию : Постановление Правительства Российской Федерации от 16.02.2008 № 87 (ред. от 01.12.2021).

О порядке организации и проведения государственной экспертизы проектной документации и результатов инженерных изысканий : Постановление Правительства Российской Федерации от 05.03.2007 (ред. от 15.09.2023) № 145.

Шалина Д. С., Ларионова В. А. Building information modeling (bim) как способ снижения рисков удорожания стоимости проекта // Фундаментальные исследования. 2021. № 12. С. 215–222. URL: https://fundamental-research.ru/ru/article/view?id=43179 (дата обращения: 11.10.2022). DOI: https://doi.org/10.17513/fr.43179

Сербин С. А., Серегина Н. Ю., Фомин Н. И. Анализ текущей нормативной документации по отношению к технологиям информационного моделирования // Природные и техногенные риски. Безопасность сооружений. 2022. № 6 (61). С. 18–21.

Downloads

Published

2023-12-30

How to Cite

Improving the organizational scheme for conducting state examination of design documentation in order to obtain a reliable estimated cost using BIM. (2023). Real Estate: Economics, Management, 4, 13-20. https://doi.org/10.22337/2073-8412-2023-4-13-20

Keywords

building information modelling (BIM) technologies building information model state examination design documentation reliable estimated cost life cycle of capital construction objects

Most read articles by the same author(s)